All-in-One Fitness App

All-in-One Fitness App

A Comprehensive Desktop Fitness Tracker

A Comprehensive Desktop Fitness Tracker

Track all aspects of your health — from nutrition & workouts to biometrics.

For individuals, groups, personal trainers, corporate wellness & schools.

Track 100+ metrics | powerful charts & analysis | works offline or in the cloud

Trusted by fitness enthusiasts since 2002. Updated for 2026.

Trusted by fitness enthusiasts since 2002. Updated for 2026.

  • No ads. No subscriptions required
  • Works on Windows 10, 11, and macOS
  • Store data locally or in the cloud
  • Built for depth—not distractions
  • No ads. No subscriptions required
  • Works on Windows and macOS
  • Store your data locally or in the cloud
  • Built for depth—not distractions

If spreadsheets and mobile apps feel limiting, it’s time for Weightmania Pro.

If mobile apps feel limiting, try Weightmania Pro.

Weightmania Pro fitness tracker dashboard in dark mode on macOS.
Weightmania Pro fitness tracker dashboard in light mode on macOS.
Weightmania Pro fitness tracker dashboard in dark mode on macOS.

Over 2 million downloads.

Over 2 million downloads.

★★★★★ Unbelievably Comprehensive! I just started using this software and I am stunned at how much I can track with it and how much I can customize the program to fit my own personal plan. Whatever you want to track, it IS possible…This is even BETTER than five stars! –H. Husman, Minnesota

When you keep a journal, you’re twice as likely to reach goals.

When you keep a journal, you’re twice as likely to reach goals.

create

Record

Log workouts, meals, nutrients, measurements, and health data in one place — for any diet or training plan.

query_stats

Visualize

See your progress at a glance with charts, graphs, calendars, statistics, reports, and 12 fitness calculators.

flag

Achieve

Spot what’s working and what isn’t, fine-tune your routine, and reach your goals sooner.

Weightmania is an app, not a webpage. It’s more secure, runs faster, and higher quality.

Weightmania is not a webpage. It’s more secure, runs faster, and higher quality.

Core facts:

Trackable metrics

Tools

Fitness calculators

Foods in database

About Weightmania

About Weightmania

Weightmania is a comprehensive fitness and nutrition tracking app for Windows and macOS. Record workouts, meals, body measurements, and health metrics like blood pressure, blood sugar, and sleep — all in one place. With up to 30 integrated tools, 12 fitness calculators, a 550,000-food database, and support for 100+ metrics, it delivers depth no mobile app can match. Choose the cloud edition to sync across devices, or the standalone edition for complete offline use and total data privacy. Trusted since 2002 by home users, personal trainers, gyms, schools, and corporate wellness programs — track one person or an unlimited group. Read our full story →

CNET Logo Editor's PickWeightmania’s interface is jam-packed with tools…We are particularly impressed with its nutrition search…Fitness buffs will appreciate this program’s elaborate approach for maintaining a healthy lifestyle. –CNET Software Editor

Top tools

Top tools

create

Journal

Records daily workouts, meals, measurements, photos, general and medical information.

calculate

Statistics

Calculates statistics for over 100 fields (minimums, maximums, averages, totals and counts) for individuals and groups.

map

Maps

Map your running, walking, cycling and hiking routes. By drawing your route on a standard or aerial photo map, you can see exactly how far you went in miles or kilometers. Map routes anywhere, on or off-road without GPS.

calendar_today

Calendar

Displays information and progress by month or  year; color- coded by workout and activity type.

summarize

Reports

Create detailed reports with up to 120 fields recorded in the journal for any date range; print or export in text, HTML or PDF format.

search

Search

Powerful search finds information fast; searches every available field in any date range instantly. For example, find every day in the journal where you ran more than 5 miles, entered specific notes or ate a particular food.

bar_chart

Charts

View progress on multiple charts; features five types of graphs, data smoothing and zoom.

lunch_dining

Nutrition

Displays up to 50 nutrients in any food; searches a large food database and lets you analyze detailed macro and micronutrients.

restaurant

Sum Nutrients

Use the meal input wizard to look up foods and sum their nutrients. Sum up to 100 ingredients at a time and save the result as a custom food. For example, you can calculate the total nutrients in a custom recipe.

Analyzing workout distance trends on multiple charts in Weightmania Pro.
Analyzing workout distance trends on multiple charts in Weightmania Pro.

Paige Waehner, Certified personal trainer and fitness author.Weightmania offers a lot bang for your buck…it allows you to track every aspect of your workouts from pace and distance to water intake and cadence…A great investment! –Paige Waehner, Certified personal trainer and fitness author

Special tools

Special tools

folder

Recipe manager

Organize and store an unlimited number of recipes. Each recipe includes directions, preparation time, total time, number of servings, a one to five star rating, detailed nutrition information and digital photos. Arrange, label, rotate, resize and print any image. Cut, copy and paste a single recipe or an entire collection.

folder

Equipment manager

Track and organize your training equipment. Know when it’s time to replace running shoes, bicycle tires and clothing. Stores the name of each item, initial use date, a detailed description and photos. By tracking equipment used in each workout, the statistics tool will calculate minimum, maximum, average, number of uses, total use-time and total distance for any date range. Great for tracking mileage on running shoes.

folder

Grocery list manager

Create and store a detailed grocery shopping list. Recorddescription, quantity and price for each item. Automatically calculates the total cost. Helps you eat better and save time at the supermarket. Print details for one item or a complete shopping list you can take to the store. It even tracks coupons.

folder

Route manager

Organize your running, cycling and walking routes. Stores the name of each course or route, distance, a detailed description, digital photos and maps. Arrange, label, rotate, resize and print any image. Anytime you record a cardio workout, select the route name from a list to automatically fill in fields and save time.

folder

Web link manager

Manage your favorite fitness and health related web links. Stores the name of each link, a detailed description and its URL. Display any web page, video or online document in one click. Keeps all your fitness links in one place and stores more detail than most web browsers. Easily share links with other people.

Daily meal and nutrient tracking with calorie goals in Weightmania Pro.
Daily meal and nutrient tracking with calorie goals in Weightmania Pro.

12 Calculators

12 Calculators

calculate

Body fat

Calculates body fat percentage, interprets the result and tells how you rate. Includes a version that requires no special tools (only a simple tape measure) and a second version for body fat calipers.

calculate

BMI

Calculates body mass index (a widely accepted measurement of weight status). Automatically interprets the result and tells how you rate.

calculate

BMR

Calculates basal metabolic rate (the number of calories your body burns while at rest).

calculate

Calories burned

Calculates calories burned for hundreds of different activities, for any amount of time and body weight.

calculate

Calories required

Calculates the number of calories you need daily, based on your age, weight, gender and activity level.

calculate

Target heart rate

Calculates the range your heart rate should be in during cardio. workouts for maximum safety and benefits.

calculate

Distance, time, pace, speed

Calculates distance, time, pace and speed after cardiovascular workouts; can also be used for planning and estimating workouts.

calculate

Splits

Calculates splits for any distance or interval; ideal for race planning or anytime you want to maintain an even pace during training.

calculate

Math and conversion

42-key calculator for basic and advanced calculations; performs a wide range of conversions between metric and English.

calculate

Heart rate timer and calculator

Helps you calculate resting heart rate. Heart rate can be used to evaluate your health and fitness level. Includes a large, scientifically accurate 2-minute, 1-minute, 30-second and 15-second count-down timer. Makes it easy to regularly check heart rate at home.

calculate

One-rep maximum weight

Calculates your one-repetition maximum weight (“one rep- max”), and 20 percentages of that weight, for any weight training exercise. This is widely used to measure overall strength and determine how much weight to use in many weight training programs.

calculate

Target weight

Calculates the total calories you need to consume or burn daily to reach a weight goal by a specific date. Helps you lose or gain weight. Just enter a weight and select a target date (it will also suggest a safe date). For more accuracy, calculations are based on BMR (Basal Metabolic Rate).

Runner's World Magazine Logo Editor's PickI spend more time on the computer than I do on the roads, so I’ve seen plenty of training sites and sampled far too many software packages. Most of them are either exercise logs, with nutrition as one of several features, or nutrition-based, with an exercise log added on…I like the Weightmania package which offers the best balance of exercise and nutrition… –Runner’s World Magazine

Twelve fitness calculators in Weightmania Pro for Mac.
Twelve fitness calculators in Weightmania Pro for Mac.
Mapping a 7.3-mile running route around a city park without GPS in Weightmania Pro.
Mapping a 7.3-mile running route around a city park without GPS in Weightmania Pro.

Major features

Major features

• Great for any type of cardio, especially running, walking and cycling.
• Record multiple weight training and cardiovascular workouts per day.
• Track average, resting and maximum heart rate.
• Track the difficulty of each workout and how you felt.
• Track weather conditions, routes, injuries and equipment.
• Track up to 100 splits per workout.
• Create and save predefined workouts (programs); enter future workouts in one mouse-click.
• Print weight training programs that you can take to the gym.
• Track equipment use (such as mileage on running shoes).
• Know when to replace running shoes, bicycle tires and clothing.
• Calculates calories burned for hundreds of exercises and activities.
• 860 exercises + 80 professionally designed workout plans; add an unlimited number of new ones too.

• Track daily calories, protein, carbs, fat, sugar, sodium, cholesterol, fiber and water.Track meals, nutrients and supplements
• Track servings, food groups and points (for diet plans that use them).
• Record foods fast with drag and drop (drag multiple foods at the same time).
• “Favorites list” conveniently stores the foods you eat most often.
• 550,000-food database with up to 52 nutrients per food (cloud version only).
• Add an unlimited number of custom foods.
• Lookup ingredients and add their nutrients together (sums nutrients for 100 foods at a time).
• Record and manage an unlimited number of recipes.
• Determine the total nutrients in any meal or recipe.
• Manage a grocery list (calculates total cost plus includes section for coupons).
• Create predefined meals (menus); in the future, enter meals for an entire day in one click.
• Calculates daily calories burned from exercise and BMR (the calories you burn at rest).
• Shows daily nutrients broken down by meal (breakfast, lunch, dinner and snacks).
• Easily compare daily nutrients to daily goals (includes recommended Daily Values).

• Map routes anywhere, on or off-road (not just roads).Map running and cycling routes.
• Distance calculations are more accurate than other sites.
• Calculates miles & KM’s for each route point + total distance.
• Store an unlimited number of routes.
• Displays Latitude Longitude for each route point.
• View street, aerial photo and hybrid maps.
• Create maps for any address in the United States & Canada.
• Fast, smooth scrolling in any direction.
• Easily move the map or route points by dragging the mouse.
• 18 zoom levels (from 1:1050 miles to 1:60 feet).
• 100% ad free! Maps contain no advertising.

• Track all the essential measurements including heart rate, body fat, and BMI.
• Precisely track your body weight.
• Track up to 7 body fat caliper measurements.
• Copy last recorded measurements to the current day in one click.
• Instantly shows you the change between current and last measurements entered.

• Track blood pressure and pulse rate.
• Track and analyze daily sleep patterns.
• Track cholesterol (total, HGL, LDL and triglycerides).
• Track blood sugar and medication up to eight times per day (for diabetes).
• Print this information and share it with your doctor.

• Create line, bar, area, pie and moving average graphs.
• Compare data on multiple graphs simultaneously.
• Zoom feature lets you enlarge graphs up to ten times.
• Create comprehensive reports in text or Web (HTML) format.
• Full size color-coded calendar for viewing data by month and year.
• Calculates minimums, maximums, averages and totals for all data.
• Summarizes information by week and month.
• Calculates total weight lifted by muscle group, for any date range.
• Calculates maximum weight lifted for each exercise, for any date range.
• Calculates mileage, number of uses and use time for equipment (like running shoes).
• Counts workouts, courses and routes you ran, days missed, etc.
• Filter lets you view specific types of workouts on graphs and charts.

• Visually track progress over time.
• “Before & after” + daily, weekly & monthly progress photos.
• Scanned documents (such as lab test results).
• Portraits of each user (when tracking groups).
• Charts and screen captures from other applications.
• Exercise, recipe, and equipment photos.
• Allows multiple photos per day for each user.
• Automatically arranges photos in album format.
• Add text descriptions below each photo.
• Smoothly resize, rotate and print any photo.

• Print custom workout and meal cards (menus and templates).Creat and print custom workout cards.
• Great for personal trainers and users of all levels.
• Create cards in PDF format that can be emailed to clients.
• Ideal for personal trainers with remote clients.
• Makes cards from predefined meal and workout templates.
• Include exercises, sets, weights, repetitions and photos.
• Leave sections blank to be filled in later.
• Add up to three photos per exercise.
• Create and print each workout card in seconds.
• View cards on-screen or save them as PDF documents (printing is optional).

• Send clients feedback, instructions and comments.
• Email an entire group in one click.
• Clients can send you messages when they have questions.
• Saves hours by eliminating daily calls.
• Works like standard email, but it’s faster and messages don’t get blocked.
• Keep your clients on-track, informed and motivated.

• Record data whenever you want (daily entry is not required).
• Every input box is optional (you don’t have to fill in everything shown).
• Can be customized for each user.
• Uses familiar spreadsheets and easy forms.
• Supports Metric and English (can be used internationally).
• Cut, copy and paste workouts, meals, tables, tabs, text, forms and more.
• Paste tables and data directly into other applications like Excel.
• Ample space for recording personal diary and daily notes.
• Each user can select from five background colors.
• Navigate fast with color-coded calendars.
• Support for workout and event planning.
• Automatically reminds you of planned activities.
• Powerful search finds previously entered information fast.
• Print any chart, table, report or screen.
• Reorder and resize any table column (remembers each user’s settings).
• Provides detailed information about the new food pyramid.
• Password protection available for each user (keeps your data private).
• Built-in, easy-to-use help system (uses familiar Web page format).

A fitness app for people serious about results.

keyboard_arrow_up